Structural engineering challenges of this building were focused on rehabilitating framing and brick walls that had been damaged by modifications over the years.

The work included following the Secretary of the Interior’s Standards to obtain Historic Preservation Tax Credits for this 1869 building. Substantial portions of the structural systems needed to be reinforced including substantial re-work of the river front brick walls and unsalvageable portions of the building were taken down.

This project includes 20 redesigned living units and 4 commercial units with associated improvements including ADA access, removal of rear addition, improvements to north lower area, and stabilization of the rear riverbank.