EV aided Dartmouth College Real Estate with a revitalization of most of a downtown city block. The aim of this “Vision Plan” was to strengthen the economic vitality and diversity of the quaint college town. Investment in commercial, retail, and residential facilities has brought new life to South Street. Civil engineering services and substantial permit negotiation were provided for a wide array of new and rehabilitated utilities both on site and off for Dartmouth College Real Estate.


The initial phase included substantial permit negotiation and a wide array of new and rehabilitated utilities both on site, and off. We also provided civil and structural support for improvements. The streetscape upgrades include landscaping, street trees, low plantings, foundation plantings, new sidewalk, accessory benches, waste receptacles, street and landscape lighting, and burial of off-site utilities.

During demolition, the project eliminated much of the underutilized housing in an area bounded by residential and commercial areas south of the downtown in the city of Hanover. The five new, mixed use buildings bring to the town 23,500 square feet of commercial space, up to 41 affordable residential units, and with the addition of underground parking, a much needed 90+ below grade parking spaces, and 20+ on-street parking spaces.

Street trees were designed with contiguous Cornell Structure soil mix below the streetscape – Silva Cells. Silva is a green infrastructure technique. Tree roots grow beneath the permeable pavement, the gaps of which absorb and filter stormwater. This symbiotic system enables the trees to grow which in turn increases the rate of which they can absorb and recycle it.

In addition, EV developed plans for a lower-level parking structure with 100 spaces. This garage was constructed with a mix of housing, retail, and additional parking above. Design and construction allowed for a phased development with occupation of the initial phase, relocation of existing tenants and subsequent construction of the second phase. Multiple points of entry at different elevations integrated with a new urban streetscape were integral to the project.

Recipient of PlanNH 2009 Merit Award