Structural engineering services were provided for the construction of a new 10,000-sf wood framed taproom and the renovation of an existing 9,000-sf steel framed building to function as a brewery.

The new taproom building will be built in the same location as an existing wood framed building that is being demolished. The project includes installation of new equipment supported at the slab on ground elevation and removing portions of the existing concrete slab for new equipment foundations.


Foundations were redesigned for two silos adjacent to the main brewery building.