Civil engineering and permitting assistance were provided for a $50M renovation and expansion project to significantly increase gallery space and a provide better accessibility. The project involved relocating the museum’s primary entrance to a more prominent and noticeable location. EV’s site design incorporated a more open and welcoming approach to the museum from one of Dartmouth’s busiest pedestrian areas. The design created a plaza between the museum, Wilson Hall, The Hopkins Center for the Arts, and Wheelock street.

This tied together previously disparate campus spaces. Connecting these elements in an accessible manor was at the foundation of the site design. Accessibility factored into the site design in a number of other ways as well. The project incorporated the reconstruction of an outdoor corridor between The Hood Museum and The Hopkins Center, which brought a major pedestrian way into ADA compliance.

The project also revamped a side entrance to The Hopkins Center, also bringing it into ADA compliance. Additional site design elements included extensive drainage features to prevent excess runoff or icing on pedestrian ways. These features lead to a subsurface stormwater detention area and sand filter for stormwater treatment and peak flow attenuation. Other civil engineering components of the project included the replacement of a 50+ year old water main, revised sewer service connections, installation of chilled and hot water distribution lines, replacement of site electrical lines, and maintaining adequate spaces and surfaces for emergency vehicle access.
Client: Dartmouth College
Location: Hanover, NH
Scope: Site Design, stormwater treatment and attenuation; utility replacements, relocations and installations.
Completion: January 2019
Size: 25,000 square feet of site work
Sustainability: Stormwater treatment and attenuation