• Skip to primary navigation
  • Skip to main content
  • Skip to footer
Engineering Ventures

Engineering Ventures

Civil and Structural Engineering

  • Home
  • Firm
    • Awards
  • Team
  • Services
  • Portfolio
  • Join EV
  • Blog
  • Pay Invoice
  • Contact Us

Master Plans

Waterfront Access North, Burlington, VT

October 10, 2023 by

Work on the Burlington waterfront north of Penney Lane included realignment of the bike path, extension of Lake Street, a skatepark, new building and boatyard for the Community Sailing Center, and the Moran Frame project nearing completion. To meet the City’s goals and state stormwater requirements, the project also included gravel wetlands and bioswales for stormwater treatment.

Together these improvements have created dynamic public space in a previously underutilized area. EV provided grading, stormwater design, utility coordination, and permit assistance for the overall project and full site design and permit services for the Sailing Center, and Moran Frame project.

Given the long history of uses on the waterfront, and the fire of 1894, there were some significant challenges presented by this location. These included soils contaminated with PAH and arsenic, unconsolidated fill, water lines in unmarked locations, and abandoned infrastructure. All grading and underground work needed to be carefully coordinated with the environmental engineers managing compliance with the Corrective Action Plan (CAP).

Hula Lakeside Campus, Burlington, VT

October 10, 2023 by

Redevelopment of an industrial site on the Lake Champlain waterfront consisted of a continuation, update, and expansion of the historic use of the site.  Research, development, general office and fabrication along with ongoing lakeside recreational uses were all present in this exciting enterprise.

Local wastewater, stormwater, erosion control, shoreline and Act 250 permitting, existing conditions review, schematic site design and improvements were provided within EV’s deliverables.

Grading and erosion prevention and a sediment control plan was developed. Driveway/parking/sidewalk cross section, including work within the City Right of Way were also provided.

Burton, Burlington, VT

October 10, 2023 by

Structural design work included the remodel of several areas of the manufacturing facility, and new construction of additions. Structural analysis was provided to determine the load capacities of new mezzanine columns on the existing concrete slab and to determine plan dimension for the base plates. Analysis and design were provided for steel framing for a new rooftop unit and steel framing for two new skylights.

In conjunction with major interior renovations, this project included site modifications to landscape and parking layout, and utility upgrades. Parking layout and traffic use was refined to allow for a 10% increase in the site green space over existing conditions.

Site design included close coordination with landscape architects to implement aesthetic qualities while improving drainage on the site. A new sewer line was designed to service the newly renovated commercial wing. Permitting services were provided for the utility work and road related issues such as curb cuts and excavation within city road limits. Burton Snowboards is LEED Registered.

Site work included the design of a sewer line to the renovated commercial wing, grading, storm run-off design, parking, curbing and sidewalk layout. State and city permitting services were also provided.

Conversations with Burton regarding 3-Ac requirements have been underway since 2014. EV designed stormwater collection and treatment systems to replace an undersized sediment basin. Given heavy soils and flat terrain, gravel wetlands were used for this campus.

This design was approved in March of 2020 under VT GP 3-9005 since GP 3-9050 was not available at this time. The new system will meet approximately 60% of the campus treatment requirements.

More recently, we have designed another system for the northern end of the campus to bring the facility fully in line with the latest Vermont requirements.

King Arthur Flour Expansion and Renovation, Norwich, VT

August 30, 2023 by

Civil and structural engineering services were provided for renovations and an expansion to include a new retail store, Baking Education Center, and state-of-the-art Bakery at the Flagship Campus. Services included permit and zoning research, and assessment of site opportunities and constraints.  Additional work includes a redesign of a failed mound disposal system to allow for the addition of a 25 seat restaurant on site.

Design integrated Low Impact Development (LID) Stormwater Treatment rain gardens, a permeable courtyard, and three large mound systems which were designed to look like rolling fields of wheat along a winding gravel drive. Also, A new customer access drive necessitated an arch bottomless culvert to minimize impacts to a natural stream.

Footer

Saratoga Springs, NY

368 Broadway, Suite 11
Saratoga Springs, NY 12866
(518) 205-9141

Lebanon, NH

85 Mechanic Street, Suite E2-3
Lebanon, NH 03766
(603) 442-9333

Burlington, VT

208 Flynn Avenue, Suite 2A
Burlington, VT 05401
(802) 863-6225

  • Facebook
  • Instagram
  • LinkedIn

Copyright © 2026 Engineering Ventures – All rights reserved – Website by Stride Creative Group.