• Skip to primary navigation
  • Skip to main content
  • Skip to footer
Engineering Ventures

Engineering Ventures

Civil and Structural Engineering

  • Home
  • Firm
    • Awards
  • Team
  • Services
  • Portfolio
  • Join EV
  • Blog
  • Pay Invoice
  • Contact Us

K-12

Kimball Union Academy Dormitories

February 3, 2026 by

Our civil and structural teams assisted with the renovation and expansion of three dorms and their respective faculty residences. KUA wanted to expand their capacity and enhance the quality of their housing. Project goals included sustainable, responsive, and functional design.

The Welch Residence Hall renovation is a 7,000 sf two-story wood-framed dormitory addition. Designs included a full basement and an attached 2,600 sf Faculty Residence.  The existing building has a stone masonry foundation.  The proposed basement elevation for the addition was approximately 4 feet lower than the existing basement elevation.  A stepped foundation was designed to avoid undermining the existing rubble foundation.

The Kilton (Howe Dewdney) Residence Hall renovation is a 7,900 sf two-story wood-framed dormitory addition. It’s design also included a 2,600 sf Faculty Residence, and another 2,100 sf Faculty Residence on the opposite side of the existing building.  There is a large light-filled two-story open space for students to gather. 

The portion of the existing building adjacent to the large dormitory addition does not have a basement – the foundations consist of perimeter frost walls and a slab-on-grade.  The adjacent dormitory addition was designed to have a full basement approximately 10 feet lower than the existing slab-on-grade.  A stepped foundation approach was also used at this building to avoid undermining the existing building’s foundation.

Foundations consist of conventional shallow foundations.  The framing consists of engineered wood floor framing and wood roof trusses.  Each dormitory building and faculty residence has an attached wood-framed covered porch. 




Vermont Integrated Architecture

ReArch Construction

Ryan Bent Photography

Burr and Burton Academy, Manchester, VT

January 1, 2024 by

Structural: Founders Hall

Burr and Burton Academy is an institution that believes in adhering whole heartedly to their values. The school’s devotion to sustainability is illustrated in everything from the content of their teachings to the buildings that facilitate learning. This project, Founders Hall, is a prime example of their commitment to honoring the past, while looking to the future. Made possible by the late Wendy and Barry Rowland, generous philanthropists who’ve donated to many projects at the school, this building was created to enhance the cross-disciplinary nature of the school and enliven overall enthusiasm for education. The hybrid Mass Timber lofted library is the epicenter of this project and exemplifies the importance of engineering. It showcases what can be accomplished. In this case, that’s an environmentally responsible building built into the hillside.  

The goal was to find the best way Founders Hall could support teachers, integrate disciplines (from STEM to the Arts and Humanities), and incorporate new types of learning for the students. This project was highly collaborative, and involved many discussions with the architects, owner, and staff. This collaboration resulted in the development of three substantial objectives. The first is the merging of English and Social Studies, to create a harmonious Humanities Department where teachers can combine classes in spaces that facilitate congruent learning. The second is moving the underutilized library into the focal point of the buildings. And finally, is the creation of the STEAM Lab which was previously in the basement. Relocating the lab to Founders Hall led to higher visibility and integration. Here, students undertake project-based learning in studios – from drawing, to furniture building, and even model creation.

Our work was to create the skeleton of this building. Through conversations, our team elected to utilize Mass Timber and Steel. These materials were selected to make the project as environmentally responsible as possible, while remaining on budget. The lifecycle assessment we conducted found that this material selection cut the building’s carbon footprint by approximately one third. The spine follows the contour of the hill it was built into, creating an organic flow. There are no hallways in Founders Hall, only common spaces for group work surrounded by classrooms. These areas are dubbed Neighborhoods to promote their collaborative intention. These neighborhoods encompass the spine of the building, which emerges into the cantilevered bell tower room, or floating library. The library, now central to the building, has transformed into a very active space, achieving the school’s goal of promoting unity and community among the students and staff. Overall, an uptick in foot traffic has revitalized the library. The overall success of this re-imagined library space has resulted in more books being checked out than ever before.

Our designs for the Mass Timber skeleton of Founders Hall are printed and posted throughout the building for students, staff, and the community at large to engage with.  The skeleton is composed of a series of Mass Timber arched frames which take inspiration from the heavy timber construction that is historic to Vermont while taking a more modern approach with the complex geometry and materials used.  The arched frames are constructed of glue-laminated beams, columns, and braces joined together with steel plates and fasteners.  The exposed nature of the structure allows students to witness and understand the engineering of the building and how it was assembled.  Each arched frame is unique in its geometry – the complex roof geometry means that the roof and wall planes are constantly changing along the length of the space, the intersecting beams and braces are all at unique angles, and the bases of the columns are at differing elevations.  The sketches showcase the complex geometry of the space.  This complex design meant our drawings and specifications were critical to both the manufacturing and assembly process.

The Founders Hall project was a success. It achieved the owner’s objective of honoring the past while looking toward the future. It revitalized and energized previously underutilized spaces including the STEAM Lab and Library. In addition, the building adhered to the overall objective of increasing environmental responsibility. It has no fossil fuel consumption, and utilizes a hydroelectric dam among other things, to retain a low carbon footprint.  Given the pandemic, certain adjustments had to be made to the initial schedule due to labor shortages and increased material lead-times. With that in mind, this project was on time and on budget.

Civil: Site Design

The Burr and Burton Academy projects used a combination of existing best practices to achieve effective stormwater management in previously problematic areas of a widespread school campus. Both buried structural and visible, thus educational, green infrastructure practices were implemented to reduce the pollutant load of stormwater runoff and reduce peak flows during larger storm events.

These projects involved significant community engagement during design as part of the Act 250 permit process. Because of this, and the location on a school campus, the public can observe and learn about the continued growth and use of stormwater management features. 

These projects gave the Burr and Burton Academy the opportunity to add handicapped parking spaces and electric vehicle charging stations, which has since encouraged employees to utilize them, keeping emissions lower. These features will help attract and retain additional students and employees to the school. We also removed parking from the center of the campus and replaced it with a campus green.  This results in more walking and healthy behavior on the campus, including opportunities for staff and students to connect for conversation in the new green.

These projects also positively affect the surrounding environment by reducing peak stormwater runoff. This allows for passive groundwater recharge and reduces the pollutant load entering the adjacent wetland. The neighboring residence used to have a constant pool of water flooding their property, and this project has stopped that and encouraged water to flow down the stormwater drains. We were excited to execute green infrastructure upgrades at a site that is frequented by today’s youth, and hope it inspires them to appreciate green initiatives.

During this project, the permit requirements changed, such as the update to the state’s Environmental Protection Rule- Chapter 22. This would not have affected the project due to it being grandfathered in, but we decided to implement some of these changes so work would not have to be redone in the near future.

The Burr and Burton Academy was actively involved in all steps of the development process, including construction. We met their timeline as close as we possibly could considering Covid-19 related materials and employer delays came into play. Their goal was to be open for the 2021 school year, and while the building wasn’t completely finished then, they were able to provide access to and use parts of the building at the beginning of the fall term.

Little Falls CSD, Little Falls, NY

August 1, 2023 by

Structural engineering services were provided for renovations and additions to the historic Benton Hall Academy, Middle School/High School and transportation facilities.  Work at Benton Hall included a 1,600 square foot two-story addition in the building courtyard.  Renovations to the Middle School/High School included expanded Middle School and High School offices and a 3,500 square foot expansion of the building along the east wall to accommodate the school’s STEAM program.

Putney School, Putney VT

August 1, 2023 by

Structural engineering services were provided for a 15,000-sf, multi-purpose field house, at this independent, boarding, secondary school. The facility, is a net zero building, which will produce more energy than it consumes. The super insulated structure uses passive solar and sixteen ground mount solar panels. This project received LEED Platinum Certification.

The facility includes an open court for basketball, volleyball, and other court games, weight-training room and yoga/fitness room that can also be used for aerobics, stretching, and sports conditioning, ski waxing room with access onto Putney’s groomed trails which is used for bike storage and repair in the off season, separate locker rooms and showers for students and faculty, office space for Putney’s athletic director and staff, and a community space where students can gather for informal meetings, conversation, and socializing.

Putney School Gray House Renovations, Putney, VT – EV provided structural engineering services for this sustainably designed renovation to the Gray Dorm at The Putney School, an independent high school in Putney, VT. Energy efficiency was a key element of the project – winning this project and architect, Maclay Architects, the Efficiency Vermont 2019 “Best of the Best” Commercial Building Design & Construction for Commercial Major Renovation.

(Photo Credit to The Putney School)

Winooski School District Facility Renovation and Expansion

August 1, 2023 by

Working with Hannah Wingate, the project team, and school facilities staff, we designed gravel wetland treatment systems and disconnections that not only meet the requirements for the expansion, but also accommodate approximately 70% of the 3-AC requirements under 3-9050.

We designed an extensive expansion and renovation of the existing School Facility in Winooski Vermont.  The complex is home to all the public-school students in Winooski and includes the High School, Middle School, Elementary School, administrative offices, cafeteria, auditorium, and gymnasium.  The population of Winooski is growing rapidly, and the student population is projected to be several hundred students larger in just the next few years. 

To accommodate the growth, the project included a new middle School wing, allowing the high school to expand into the previous middle school, as well as a doubling of the elementary school by adding a new elementary school wing.   The project also included a new administrative area adjacent to a new main entry, cafeteria, and library expansion as well as a new performing arts center and gymnasium. 

The structure of the new construction is noncombustible steel framing with open web joists, columns and block walls supported by shallow foundations.  Renovations and modifications to the existing wings were complex and challenging, requiring many creative solutions. 

The site had 3-9010 and 3-9015 permit coverage for two small portions of the existing campus, but little other stormwater treatment or management.

Working with Hannah Wingate, the project team, and school facilities staff, we designed gravel wetland treatment systems and disconnections that not only meet the requirements for the expansion, but also accommodate approximately 70% of the 3-AC requirements under 3-9050.

We worked closely with the contractor during construction, developing solutions to many unique and hidden conditions as they were uncovered.  The project was started in the summer of 2019 and construction was completed by the end of 2022.

Footer

Saratoga Springs, NY

368 Broadway, Suite 11
Saratoga Springs, NY 12866
(518) 205-9141

Lebanon, NH

85 Mechanic Street, Suite E2-3
Lebanon, NH 03766
(603) 442-9333

Burlington, VT

208 Flynn Avenue, Suite 2A
Burlington, VT 05401
(802) 863-6225

  • Facebook
  • Instagram
  • LinkedIn

Copyright © 2026 Engineering Ventures – All rights reserved – Website by Stride Creative Group.