Civil engineering, foundation design, and permitting services were provided for a 35,000sf addition (15,750sf of which is a future phase).
The project included a roughly 600’ truck access drive plus aprons and loading docks (8), 20 parking spaces adjacent to the addition and 43 parking spaces plus drives across the street, miscellaneous walks, 100’ waterline service connection, adaptation and reuse of existing sewer service line, and the stormwater conveyance and treatment.