This project focused on circulation, utility and stormwater improvements on Burlington’s waterfront.
The design included reduced paving, simplified circulation patterns, improved surface features, the burial of unsightly overhead utilities and several innovative stormwater features.
The stormwater features included a permeable paved lot to replace an existing parking area and a rain garden adjacent to the ECHO Museum entry.