Structural design was provided for a two-story boathouse on a floating barge with two moveable bridges.
Marine design work included piles to moor the barge, pile supported wood decks over the water, and shoreline protection for the on-shore facilities. The project included flexible utility connections to shore, site design, and wood piers and decks over the lake (Experience of a Principal prior to EV).
Recent work includes evaluation and repairs to deteriorated ramp structures.
OLYMPUS DIGITAL CAMERA OLYMPUS DIGITAL CAMERA OLYMPUS DIGITAL CAMERA OLYMPUS DIGITAL CAMERA OLYMPUS DIGITAL CAMERA