
Kaley joined our Burlington, Vermont office in June 2026 immediately after earning her Bachelor of Science in Environmental Engineering from the University of Vermont.
For her Senior Capstone Design project, she assisted the Town of Plainfield with a Culvert Assessment on Gore Road. She conducted site investigation, and hydraulic and structural analysis to assess the failing culvert. She then developed a cost-effective replacement design working under site and regulatory constraints. Her deliverables included engineering drawings, calculations, and a final technical report summarizing her findings, design rationale, and recommendations.
At EV, Kaley’s workload includes drafting, regular use of AutoCAD Civil3D, and HydroCAD, design, application and construction observation aspects of site layout, grading and main civil utilities (water, sewer, stormwater). She will also assist with permitting, site visits (measuring, survey, soils review, infiltration testing, etc.), construction administration, and more.
Kaley’s experience as Pi Beta Phi Chapter President has equipped her with strong leadership and communication skills. As president, she led over 100 members and a 24-person executive board. She has a proven ability to manage multiple responsibilities, execute clear and effective communication, and keep teams aligned toward shared goals.
