Search Projects:
Searches project name, client, location, market, service, and description
UVM Davis Center
Burlington, VT
- Client: University of Vermont
- Service: Structural
- Markets: Institutional, College
‣ During construction efforts were made to use recycled and locally produced materials whenever possible - the building's 62,000 slate shingles were made in Fair Haven, Vt., and 65 percent of all materials were manufactured within 500 miles - three times the LEED requirement.
‣ Ninety-two percent of all construction waste was reused or recycled.
‣ This building was recently awarded LEED Gold Certification, as well as a 2008 ACEC Grand Award for Engineering Excellence.
< Back one page
